Picture a Saturday morning at a hardware shop in Ruiru (an example, but a familiar one). A contractor walks in for three rolls of 2.5mm cable and there are none. The owner, Mwangi, knows exactly why: he looked at the shelf on Wednesday, saw "a few rolls", and decided it could wait until Monday. The contractor buys from the shop across the road, and Mwangi wonders, not for the first time, whether that contractor will come back.
Mwangi did look at his stock. What he could not see was how fast it was moving and how long his supplier would take to refill it. That missing half is what a reorder point captures.
The arithmetic, once#
You only need to do this by hand once to understand it. Take the cable:
- Sales speed: over the last eight weeks the shop sold 112 rolls. That is about 2 rolls a day.
- Lead time: from the day Mwangi orders to the day the cable is on the shelf is usually 5 days.
- Safety buffer: deliveries are sometimes late and some weeks are busier, so he keeps an extra 3 days of stock.
The reorder point is sales speed times (lead time plus buffer): 2 x (5 + 3) = 16 rolls. When stock falls to 16, he orders. On Wednesday there were 9 rolls on the shelf, which was already past the point. "A few rolls" was four and a half days of sales with a five-day wait.
How much to order is a separate choice. A common approach is to order enough for a set period, say two or three weeks, rounded to how the supplier packs it.
Why the spreadsheet version fails#
Plenty of owners have tried to keep a sheet of reorder points. It usually works for a month. Then three things happen:
- Sales speed changes. Cable sells faster when a housing estate nearby is being built and slower when it is finished. A number typed in March is wrong by June.
- Lead times drift. A supplier who used to deliver in three days starts taking six. Nobody updates the cell.
- There are too many items. A hardware shop can carry a thousand lines. No one is recalculating a thousand rows every week.
So the sheet goes stale, the owner goes back to looking at shelves, and the Saturday problem returns.
How Rai works it out#
This is a Stage 4 job on the NGAZI ladder: reasoning over the history a shop has already built up. Rai, the analyst inside UpeoRetail, reads the sales and stock the shop records every day and does the arithmetic above for each item, continuously, from the real figures.
When something is heading for the reorder point, it says so in plain language and shows its working:
2.5mm cable: 9 rolls left. Selling about 2 a day over the last 8 weeks. Your last three orders from this supplier took 4 to 6 days. Suggest ordering 40 rolls now.
The useful part is the second and third sentences. You can check them against what you know. If you know the estate project just finished, you can order less. Rai is doing the counting; you are still doing the judging.
When you agree, Rai can prepare a draft purchase order. It does not place it. As we explain in no silent writes, every order waits for you to approve it.
What to do this week#
You do not need Rai to start. Pick your ten fastest-moving items, the ones a customer would be annoyed not to find. For each, write down:
- How many you sold in the last four weeks, divided by the days you were open.
- How many days your supplier usually takes from order to shelf.
- How many days of buffer you are comfortable with.
Multiply, and stick the number on the shelf edge or in your phone. When a shelf reaches its number, order. Ten items, one afternoon.
After a month you will know two things: whether your stock-outs on those items stopped, and whether keeping even ten numbers current by hand is something you want to do forever. That second answer is usually the moment a shop decides it wants the arithmetic done for it.